Construction Type: New
Building Type: 95% Administrative/ 5% Retail with underground parking garage
Features: Central seasonal cooling/heating, electronically controlled elevators, central fire detection system, electronic security system, open/closed floor plans, on-site property management, steps from Holešovice metro station, train station, bus terminal and tram.
Zoning Permit: 10.02 +/-
Construction Permit: 12.02 +/-
Construction Start: Phase I - 02.03 +/-, Phase II – To be determined
Construction Complete: Phase I - 08.04 +/-, Phase II – To be determined
Number of Floors: Phase I – Nine levels; Phase II – Seven Levels
Gross Building Area: Phase I – 15 100 m2; Phase II – 13 000 m2
Lease Area: Phase I – 8 915 m2; Phase II – 7 823 m2
Garage Parking: Phase I – 99 stalls; Phase II – 104 stalls
 

In December 2001, Landmark s.r.o. secured the purchase of 6 996 m2 of vacant property within 30 meters of the Holešovice metro.  Conceptual planning and an urban land study are currently underway.  The size of the property could allow the construction of four separate buildings varying in size and type.  The first two projects are currently in the planning stages, which shall be for Administrative/Retail use.  Additional phases shall include the possibility of additional retail and a residential unit.  A portion of the land shall be used as a park for adjoining property occupants.  Due to the location, this property should be idea for occupants looking for modern office space near the city center and public transportation.

Since this property will have great visibility, great emphasis on the architectural style will be given to enhance the image of the area.